What are the allowed construction hours?
Construction. Noise generated from the erection, excavation, demolition, alteration, or repair of any building or development are expressly not permitted during the hours and dates written below. These restrictions apply to all construction activities unless deemed urgently necessary for public health and safety, in which case a permit from the building official is required for alternative hours.…
-
Does the City have requirements for matching siding/shingles for repair or replacement?
Resolution #23-1953 on Workmanship, Siding Repairs and Water Resistive Barriers was designed to guide residents and contractors in maintaining the highest standards of workmanship when addressing repairs to the exterior finish, as outlined in the adopted Property Maintenance and Residential Codes. The resolution encourages a comprehensive approach when replacing siding and shingles. If a damaged…
-
What should I do when selling or buying a house with unpermitted work?
Unpermitted work happens for many reasons. You may be hesitant about the requirements, the additional paperwork, the home assessments, etc. However, when it comes time to buy or sell the home, this information should be disclosed. You can always call the building division to ask if a permit was obtained and approved for the work completed. If you…
-
Can I perform the work under a permit myself or must I have a licensed contractor?
-
Can I schedule a specific time for my inspection?
-
My neighbor has been cited for tall grass, how long does it take to get it cut?
Either the resident in violation will cut the grass (needs to be less than eight inches) or the City will send out a contractor to cut the grass after a 10 day notice period (first violation), 5 day notice period (repeat viloation). Once the contractor has cut the grass, the City will post a lien on…
-
Is a permit required for concrete flat work?
-
I finished my basement without a permit and now I need to sell my house. What do I do?
A permit is required for projects previously completed. A disclaimer statement maybe provided on the property card to note that no inspections of the underlying walls occurred and that a permit was obtained after construction. The inspector will note any other changes to the dwelling from the previous inspection. Some changes may be required to…
-
How long is a permit valid and can it be extended?
-
How long does it take to obtain a permit?
Miscellaneous permits take approximately five – seven business days to complete. New construction (master) house permits take seven – 10 business days and new construction (same as) house permits take five – seven business days. Building permits are valid for six months from the date of the last inspection.