David Hoekel Parkway

Project Status

David Hoekel Parkway is the result of over twenty years of planning that began with the inclusion of David Hoekel Parkway on the City’s Comprehensive Plan in 1999.  The idea was to create a new roadway that would provide a new connection between Interstate 70 and Highway 61, a significant but necessary undertaking to serve the rapidly growing community.

Due to the scale of the project, David Hoekel Parkway has been divided into multiple phases:

  • Phase 1 [COMPLETE] – The first phase involved the construction of a new interchange of Highway 61 at Route P and Peine Road, which was completed in 2019.  This interchange replaced the at-grade intersections of Highway 61 at Peine Road and at Route P with a safer overpass that connected Route P and Peine Road.  This interchange was designed and constructed to become the eastern end of David Hoekel Parkway. 
  • Phase 2ABC [COMPLETE] – The second phase of David Hoekel Parkway focused on creating the new interchange of David Hoekel Parkway with Interstate 70.  This project involved constructing bridges over both Interstate 70 and the adjacent railroad tracks, along with new ramps and roadway connections to the north and south.  This project was substantially completed in 2022, and this project earned the City the Project of the Year award from the Missouri Chapter of the American Public Works Association.
  • Phase 2D [COMPLETE] – Originally envisioned as part of a larger Phase 2 project, Phase 2D extends David Hoekel Parkway north approximately one mile from West Pearce Boulevard to West Meyer Road.  This north-south connection helped transform travel in western Wentzville by providing significant relief to the local roadways that originally served this area.  This phase of David Hoekel Parkway was completed near the end of 2024.  More information about this phase can be found at this link.
  • Phase 3 [IN PROGRESS] – The third phase of David Hoekel Parkway is an ambitious project to construct over three miles of roadway and shared-use path from West Meyer Road to connect with the Phase 1 project at Granville Drive.  This project will practically complete the envisioned “outerbelt” project approximately ten years ahead of the schedule outlined in the 2009 planning documents.  Design and acquisition are underway for this phase of David Hoekel Parkway, with construction expected to begin in 2027.  More information about this phase of David Hoekel Parkway can be found at this link.

David Hoekel Parkway is the result of extensive planning, dating back to 1999, when David Hoekel Parkway was first identified in the City’s Comprehensive Plan.  Several important documents were developed from 2001 to 2014 to prepare for and authorize the construction of David Hoekel Parkway:

  • Environmental Assessment
  • AJR
  • Corridor Preservation Study