Building Inspections
Once your permit is issued, you may call or request an inspection by clicking the Electronic Inspection Requests link below. Inspections are offered Monday through Friday from 8 a.m. till 3 p.m. with a break for lunch. The permit number (located at the top of the permit card) is required when calling in any inspection. Inspections must be called in by 3 p.m. of the proceeding day for next day service. A 24-48 hours notice is required to ensure that your inspection is at the date and time necessary. Scheduling is on a first-come, first-served basis.
Inspections may be scheduled by calling (636) 327-5101 or by Electronic Inspection Requests.
2023 Building Permit Fee Changes
2023 Building Permit Fee Changes
Type of Inspections:
Inspections per site may vary, consult an inspector for details.
- New House: Footing, Sewer Lateral, Ground Rough Plumbing, Complete Rough, Sewer Lateral and Final Building
- To submit a Soils Report or Spot Survey for a new home inspection click here
- New House Yard Inspections: Yard Inspections are required to be completed by the Engineering Division to obtain a Full Occupancy, see the requirements at Plot Plan Review and Yard Inspections
- Deck: Footing, Rough and Final
- Finished Basement: Complete Rough and Final (Ground Rough Plumbing, if adding plumbing under the floor)
- Fence: Locate and Final
- Above Ground Swimming Pool: Locate, Rough Electric and Final
- In-Ground Swimming Pool: Locate, Ground Rough Plumbing, Electrical Rough and Final