In response to resident input, the City’s elected officials have once again focused their attention on the annual street maintenance program. The City annually reviews all City streets and develops a cost-efficient schedule designed specifically to replace deteriorated concrete slabs based upon individual concrete slab conditions. To equitably select these slabs, City staff performs field inspections and uses GPS equipment to identify the street segments that are in the worst overall condition within the City. This information is processed with in-house engineering staff to cost-effectively prepare the annual slab replacement program.
2022 Slab Replacement Project Locations
Victorias Ridge - Highland Meadows PlaceVillages at Prairie Bluffs - Prairie Bluffs Drive, Valley Bluffs Drive
Newport Meadows - Reliance Road, America Street, Defender Drive, Intrepid Avenue
Albany - Albany Manor Drive
Fox Ridge - Fox Creek Drive, Essex Drive, Preserve Park Place, Bedford Way
Midland Business Park - Midland Park Drive
Stone Meadows - Perry Cate Boulevard
Golf Club of Wentzville - Paddington Drive, English Manor Drive, Kelcross Drive, Wind Creek Drive, Devonshire Country Drive, Hartford Valley Drive, Fairway Valley Drive.
An additional quantity of concrete street slabs to be replaced will be added to the contract at a later date. The locations of this additional replacement have not been determined.
2021 Slab Replacement Project Locations
Portions of the 2021 Slab Replacement Project were delayed for the Winter due to weather limitations. The contractor will return to Wentzville in March to complete the remaining portions of the contract
Heritage Pointe - Savannah Terrace, Pierce View Circle
Fairview Farms - Fairview Farms Drive
A portion of Interstate Drive.
Residents are encouraged to use alternative routes around the construction zone whenever possible. Extra attention to changing road conditions is greatly appreciated.
The City of Wentzville recognizes the inconvenience experienced by residents during road construction and attempts to expedite the process in the safest and most timely manner possible. We greatly appreciate your patience. Feel free to email brent.ermeling@wentzvillemo.org with any comments or questions.